top of page
featured projects
4 storey Condo Building
St Louis Development, Tilbury Ontario
By Baird AE
Adam Meloche was responsible for the design and construction documents of the St Louis Development
Proposed 2 storey renovation of a private residence on Lake Erie.
65,000 sqft 80 bay Cross Dock Facility - completed 2018
Cross dock facility, London Ontario
By Baird AE
Adam Meloche was responsible for the design and construction documents of the Cross Dock Facility
The designs are an exploitation of existing physical and visual connections; each designer needs to explore the explicit and implicit space-making opportunities inherent in each site.
bottom of page