top of page

featured projects

Condo building, chatham tilbury ontario

4 storey Condo Building

St Louis Development, Tilbury Ontario

By Baird AE

Adam Meloche was responsible for the design and construction documents of the St Louis Development

Residential design, custom home

Proposed 2 storey renovation of a private residence on Lake Erie.

Industrial architecture, architecture

65,000 sqft 80 bay Cross Dock Facility - completed 2018

Cross dock facility, London Ontario

By Baird AE

Adam Meloche was responsible for the design and construction documents of the Cross Dock Facility

05.jpg

The designs are an exploitation of existing physical and visual connections; each designer needs to explore the explicit and implicit space-making opportunities inherent in each site.

GET IN TOUCH:

p. 416.825.7660

e. adam@ma-studio.ca

380 Pelissier St, Suite 208

Windsor, ON N9A 6W8

  • Instagram

2023 by meloche architecture studio

CONTACT US:

bottom of page